The truck was too big for the main entrance so he had to come across a vacant lot from the main road.
|
Our first glimpse of the Bible shipment! What a blessing!
|
The first box comes off.
|
The boxes had to be off-loaded so the crane could remove the container from the truck.
|
An assembly line was formed to get the work done in the least amount of time. It still took several hours to unload and reload.
|
| | | | |
| | | | |
|
|
|
|
|
|
|
|
We even used a long plank to speed up the process. We slid the boxes down to a catcher below.
|
The crane driver "said" he could lift it partially loaded. After 2 tries with different amounts of boxes left inside, the driver conceded and said that his crane would not lift it unless it was empty.
|
|
Finally... Lift-off!
|
| | | | |
| | | | |
|
|
|
|
|
|
|
The empty container was placed on the ground as the truck drove out from under it.
|
Then it was loaded onto the crane's back.
|
From there it was guided to sit alongside an existing building.
|
Large wooden blocks were placed underneath to keep it off the ground.
|
Then the reloading began.
|
| | | | |
| | |
|
|
|
|
|
This little man was a big help. He carried 1-2 boxes of Bibles at a time.
|
The last box is loaded!
|
The doors are securely closed and locked until we can return for our first load to distribute. God is good and His Word is perfect!
|
| | |